A small but technical subdivision of 14 lots, this project was completed over the 2022/23 earthworks season. The weather conditions during this season were not favourable.
to earthworks compaction and as a result lime stabilisation and importation of material was required to reach the required compaction specifications. Retaining walls of two to three metres were then constructed to the end and rear of the site. Installation of stormwater, sewer and water reticulation was implemented along with a 600m2 concrete right of way with an in-situ swale. The SABRE team worked collaboratively with the client, project engineers and the council through challenging weather conditions to ensure the successful completion of this project.