Geothermal Power Station

Geothermal Power Station
Taupō
Client: Contact Energy

SABRE are currently working on the Earthworks and civil aspect of the new Te Huka Unit 3 project which is a 50 MW geothermal power station for Contact Energy. The site is located approximately 5 km from Taupo town centre. SABRE understands the risks associated with working around energy production infrastructure and is competent in all health and safety, quality assurance and contract management requirements.

SCOPE OF WORKS:

  • Erosion and sediment control plan
  • Erosion and sediment control works
  • Stormwater diversions
  • Bulk earthworks – power station pad completion
  • Bulk earthworks – separator, silencer and vent station pad
  • Bulk earthworks – CSB Building platform
  • Stormwater pond
  • Permanent stormwater drainage