Hastings Road Upgrade

Hastings Road Upgrade
Tauranga
Client: Tauranga City Council
Project Value: $2.0M

SCOPE OF WORKS:

  • Traffic management
  • Location of existing services, site clearance and service re-location.
  • Design and implementation of Erosion and Sediment Control Plan.
  • Widening Hastings Road from 5.0m to 6.0m including the construction of subgrade, subbase, base course and chip seal surface.
  • Construction of kerb and channel, footpath and vehicle crossings.
  • New catchpits and connections to stormwater mains
  • Installation of new water main

Construction of three retaining walls:

  • 5.0m steel UC wall
  • 2.0m pole and timber wall
  • 1.0 -3.0m stone block walls

GET IN TOUCH

EXPLORE

DESIGN, SHAPE
& DELIVER WITH US
PLAN, DESIGN
& BUILD WITH US
PROTECT, GROW
& ADD VALUE WITH US

This website uses cookies to ensure you get the best experience on our website.