Client: Uzabus
May – December 2023

SABRE Civil started this project by completing the earthworks and drainage as well as creating a 9000m2 bus parking area. SABRE Commercial then went on to complete the construction of a three story building which included offices and a workshop. Solid foundations were laid to carry the heavy load of a structural steel frame with metal clad roofing. Cross laminated timber flooring panels completed the office floors along with precast concrete internal partitions to the workshop. Exterior cladding includes long run colour steel combined with Axon cladding to the entry portico and deck facade. A bus wash building was also constructed on the site further into the bus parking area.

The building was designed by Insight Architecture with innovative products which enabled the SABRE commercial team to speed up the construction process.

SCOPE OF WORKS:

  • Earthworks and drainage
  • Full construction of 9000m2 bus parking area
  • Full construction of building

GET IN TOUCH

EXPLORE

DESIGN, SHAPE
& DELIVER WITH US
PLAN, DESIGN
& BUILD WITH US
PROTECT, GROW
& ADD VALUE WITH US

This website uses cookies to ensure you get the best experience on our website.